Trelleborg Sealing Solutions are based in Tewksbury and branch into multiple industries including aerospace, energy, oil, and the engineering industry to name a few.

With almost 800 luminaires across the Trelleborg facility, CEMA Lighting needed to produce an efficient and organised plan to convert the lighting system in the quickest and least disruptive way possible. This meant that precise lighting designs were created for every area, and an installation audit was a necessity for the operation team before the work began.

The biggest challenge for CEMA Installation was the main factory area which housed 447 2x70w batten fittings. Due to the high ceilings and large machinery, CEMA Installations required specialised access equipment to install the new system safely. New energy-efficient lighting was also introduced into the canteen, offices, reception, and testing Labs as well as corridors, toilets, and smaller rooms for tool cleaning and maintenance.

Trelleborg Sealing Solutions were able to achieve financial savings of over 61% with a return on investment of 15 months. This means that over the 5-year warranty period for CEMA Lighting products, Trelleborg will save over £250,000.

Our Products

  • LED Recessed Halo Panel Light Product Link

    View Product

    LED Recessed Halo Panel Light

    See above for the product used on this installation

  • Super Lumen Highbay Product Link

    View Product

    LED Super Lumen Highbay

    See above for the product used on this installation

  • LED Glass Recessed Round Panel Light Product Link

    View Product

    LED Glass Recessed Round Panel Light

    See above for the product used on this installation

  • LED ATEX Rated Linear Fitting Product Link

    View Product

    LED ATEX Rated Linear Fitting

    See above for the product used on this installation

This site uses cookies. By continuing your visit, you accept their use as set out in our Cookie Policy. OK