Rase Distribution Ltd
Rase Distribution Ltd
Founded in 1967, Rase Distribution has been providing logistics solutions for packaged hazardous waste within several sectors and industries.
CEMA Lighting installed bespoke lighting systems tailored to their requirements for both Rase facilities in Wickenby and Bardney saving an average of 57% across both sites.
In Wickenby, Rase Distribution was allocating almost £40,000 per year towards the running and maintenance of their current lighting system which was teeming with old Fluorescent tubes and metal halide products. In line with CEMA Lighting’s 50% savings guarantee, the free consultation proposed financial savings of over 61%, exceeding Rase Distributions expectations.
Throughout the ransit bay, storerooms and some office areas were 1.8 Metre 2 x 70-watt Linear Fittings which produced low-quality light levels and were dim and yellow in colour. These were replaced by a combination of CEMA Lighting’s market-leading 190lm/w LED Super Lumen Circular Highbay and our LED 60-watt High-Output Linear Fitting to create a consistent level of light, as well as suiting the higher ceilings in selected areas.
At the distribution centre in Bardney, the main fitting that was previously installed were 1.8 Metre 2 x 70 watt Linear Fittings similar to the facility in Wickenby, which were also replaced with CEMA Lighting’s Signature LED 200 watt Super Lumen Circular Highbay to reduce the running costs in this area alone by almost £4,500.
The outdoor area was lit with 400w metal halide floodlights which were inefficient and took 15-20 minutes to warm up before operating at their peak. CEMA Lighting knew the perfect replacement was the LED 200-watt Adjustable Modular Floodlight Fitting allowing for the light to be directed to exactly where it was needed and cutting the energy consumption in half. As a result, for the new lighting system, Rase Distribution are now only spending 48% of their original lighting costs running the new system in Bardney.